A Model View Controller Based Platform For The Modeling And Simulation Of The Hoist Scheduling Problem
Need help with a related project topic or New topic? Send Us Your Topic
DOWNLOAD THE COMPLETE PROJECT MATERIAL
A Model View Controller Based Platform For The Modeling And Simulation Of The Hoist Scheduling Problem
ABSTRACT
The hoist scheduling problem is a significant challenge in designing and controlling manufacturing processes. Finding an appropriate timetable might be challenging with big hoist and tank numbers. This has led to the development of numerous scheduling algorithms, necessitating their evaluation.
To evaluate various hoist scheduling methods, a cost-effective and efficient method is required. To overcome this issue, I propose creating a visual simulator using Java technology. This operation will cut costs while ensuring product quality in production lines.
Chapter one
1.1 Statement of the Problem and Motivation
This effort aims to create a simulator with a graphical user interface for evaluating hoist scheduling techniques.
The model-view-controller (MVC) design paradigm will be used.
The simulator simulates and evaluates several hoist scheduling techniques. It reports violations of constraints and compares algorithms to determine optimal scheduling. The simulator will be built utilising Java.
Hoist scheduling problems (HSP) are common in manufacturing lines across sectors. This is an NP-complete issue. Researchers have developed many heuristic approaches to address this problem.
The issue is with the scheduling algorithm for an automated hoist system. To analyse and compare various algorithms, a visual tool is necessary.
1.2 THESIS.
I propose a visual simulator for evaluating various hoist scheduling strategies. I propose using moves from the hoist scheduling method as input for this simulator to simplify and reduce the cost of evaluating the process. The motions can take the form of text files.
2
We are using an MVC architectural design pattern for our simulator.
Do you require the whole work named A Model View Controller Based Platform For The Modelling And Simulation Of The Hoist Scheduling Problem? Click below.
Need help with a related project topic or New topic? Send Us Your Topic