Site icon Premium Researchers

Design And Construction Of Automatic Phase Selector

Do You Have New or Fresh Topic? Send Us Your Topic

Design And Construction Of Automatic Phase Selector

 

Abstract A dependable and uninterruptible power supply is essential for mission-critical loads to operate efficiently and optimally. However, in most developing countries, the electric power supply is characterized by frequent failures, and when it is available, it is largely unreliable because the standard three-phase power supply is frequently unbalanced, and the quality is degraded by fluctuations.

This project required the design and development of an automatic three-phase power supply selector to ensure continuous and reliable power supply to critical infrastructure.

The automated system’s performance was tested, and the results showed that whenever a voltage input or any combination of inputs from the three power phases that served as reference inputs to the control system was present, a voltage output was automatically produced to ensure reliable supply to mission-critical loads.

 

Do You Have New or Fresh Topic? Send Us Your Topic 

 

TABLE OF CONTENT
Title page- – – – – – – – – i
Approval page – – – – – – – -ii
Dedication – – – – – – – – -iii
Acknowledgement – – – – – – – -iv
Abstract – – – – – – – – – -v
Table of content – – – – – – – -vi

CHAPTER ONE
INTRODUCTION – – – – – – – -1
1.0 Background of the study – – – – -1
1.1 Statement of the problem – – – – -5
1.2 Purpose of the study – – – – – -6
1.3 Significance of the study – – – – -8
1.4 Research questions – – – – – -9
1.5 Scope of the study – – – – – – -10

CHAPTER TWO

LITERATURE REVIEW – – – – – – -11

CHAPTER THREE

Research methodology – – – – – – -39
Design of study – – – – – – – -40
Area of study – – – – – – – – -40
Population of the study – – – – – – -41
Sample and sampling techniques – – – – -41
Instrument for data collection – – – – -41
Method of data collection – – – – – -42
Method of data analysis – – – – – – -43

CHAPTER FOUR

Presentation, analysis and interpretation of data – -48
Discussion of findings – – – – – – -56

CHAPTER FIVE

Summary of findings – – – – – – -60
Conclusion – – – – – – – – -61
Recommendations – – – – – – – -62
Suggestions for further research – – – – -64
References – – – – – – – – -65
Appendix I – – – – — – – – -68
Questionnaire. – – – – – – – -69

 

Design And Construction Of Automatic Phase Selector

Not What You Were Looking For? Send Us Your Topic

INSTRUCTIONS AFTER PAYMENT

After making payment, kindly send the following:

» Send the above details to our email; contact@premiumresearchers.com or to our support phone number; (+234) 0813 2546 417 . As soon as details are sent and payment is confirmed, your project will be delivered to you within minutes.