Site icon project topics writing

Increasing the Capacity of Concrete Column with Integrated Permanent Formwork Using Wood-Wool Cement Board

Do You Have New or Fresh Topic? Send Us Your Topic


Post Views:
1

Growing construction activities requires increase in construction materials. The conventional method of constructions results in a rise in construction waste. Formwork as a main factor to generate construction waste has been the topic of investigation. The permanent formwork has been introduced with the aim to: promote the construction technology process that put quality, safety and environment issues into account, reduce the cost of workers and reduce the overall time of construction project. At present the permanent formwork available in the market are made from steel, and plastic and the cost is still high. Therefore this study is looking at the potential of commercial wood-wool cement board (WWCB) as permanent formwork. A series of concrete columns were constructed with and without integrated WWCB with different configurations of WWCB as permanent formwork. These columns were subjected to axial load and the compressive strength and failure modes were recorded. The results show that the present of permanent formwork from WWCB improves the compressive strength of the column. With the permanent formwork, the size of concrete column can be reduced and able to support the same load as column without permanent formwork. Therefore this construction method can reduce the overall cost of construction. 

Related

Previous articleBook Review: Running a Big Ship: The Classic Guide to Managing a Second World War Battleship

Not What You Were Looking For? Send Us Your Topic

INSTRUCTIONS AFTER PAYMENT

After making payment, kindly send the following:

» Send the above details to our email; contact@premiumresearchers.com or to our support phone number; (+234) 0813 2546 417 . As soon as details are sent and payment is confirmed, your project will be delivered to you within minutes.